18
MATTOC PRO SERVICE MANUAL
10
11
Insert IRT piston into stanchion. Apply
even pressure to piston surface as you
work the piston seal past the stanchion
threads.
Liberally grease the IRT piston seal and
outer surface with Slickoleum™ grease.
Apply Slickoleum™ grease to the
threads of the stanchion.
Install IRT into stanchion. Torque to
60-80 in lb [6.8-9.0 N m].
AIR SPRING SERVICE
9