25
MATTOC PRO SERVICE MANUAL
CASTING INSTALL
4
5
6
Slide casting onto the stanchion
assembly. Only slide the casting down
about halfway at this point. Take care
that the seal lips do not fold over upon
installation.
Insert 15cc of semi-bath into each
casting leg. Once the semi-bath is in the
legs slide the casting the rest of the way
onto the stanchion assembly.
Using an 8mm Hex wrench tighten the
rebound damper rod to 35–40 in lb
[3.95–4.5 N m] by turning them counter-
clockwise. Do not overtighten, doing so
can damage the end of the rods.