EasyManua.ls Logo

Manitowoc QY0874C

Manitowoc QY0874C
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
–6–
Installation
LOCATION OF ICE MACHINE
The location selected for the ice machine head section
must meet the following criteria. If any of these criteria
are not met, select another location.
The location must be free of airborne and other
contaminants.
The air temperature must be at least 35°F (1.6°C),
but must not exceed 110°F (43.4°C).
The location must not be near heat-generating
equipment or in direct sunlight.
ICE MACHINE HEAD SECTION CLEARANCE
REQUIREMENTS
Q0600C/Q0800C/Q1000C
Top/Sides
There is no minimum clearance required, although
5 in. (127 mm) is recommended for efficient operation
and servicing only.
Back
1 in. (25 mm) required when routing electrical inlet,
water inlet and refrigeration tubing out of the top of the
unit.
5 in. (127 mm) required when routing all connections
out the back.
SU1000/SerVend UC-300:
Top
40 in. (100 mm) required for cleaning procedures and
servicing.
Back
12 in. (30.5cm) required for cleaning procedures and
servicing.

Table of Contents

Related product manuals