EasyManua.ls Logo

Matsui MGD-15J - Page 32

Matsui MGD-15J
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 Preparation for Operation
- 28 -
[WO-8525]
Step
Confirmation unit and checking item
1.Setting range………………999 sec.
2.Shipment setting value……25 sec.
3.Standard setting value……
Hopper on the molding unit without discharge valve…3 sec.
Hopper on the molding unit with discharge valve……25 sec.
No.3 Discharge timer
(In case with two
directions of the
secondary convey)
Press the SV switch.
Press a present setting value alternately until a dc3 is displayed on
the indicator.
Press the Enter switch.
The present setting value blinks on the indicator.
The discharge time changes with kind, capacity of the hopper on the
molding unit. Set to the time where material in the hopper on the
molding unit is fully discharged.
Push the ▲ ▼ switch and change the setting value.
When pushing these switches, the value becomes the addition and the
subtraction in order.
Also, when continuing to push a switch, automatically, the value
becomes an addition and a subtraction.
Push the Enter switch and input the setting value.
When not pushing this switch, the setting value can not be changed.
Surely, press.
1.Setting range………………999 sec.
2.Shipment setting value……25 sec.
3.Standard setting value……
Hopper on the molding unit without discharge valve…3 sec.
Hopper on the molding unit with discharge valve……25 sec.

Table of Contents