TABLE 3. JOINT OPERATION, BRACKET 2
ORDINE INTERVENTO
STATUS OPERATION r10 r15 r12 r16 r23 r24
12
1)
2) Aer r12 minutes, heat pump
HEAT /
HEAT+SAN
HEAT/DHW 1 1
Set the min-
utes
Set the min-
utes
0 3
TABLE 4. OPERATION IN SUBSTITUTION
INTERVENTION ORDER
STATUS OPERATION r10 r15 r12 r16 r23 r24
1
1) Boiler
2) Aer r12 minutes,
heater
HEAT /
HEAT+SAN
HEAT 0/1 0/1/2
Set the min-
utes
/ 4/6 1/3
2
1)
2) Aer r12 minutes, boiler
HEAT /
HEAT+SAN
HEAT 0/1 0/1/2
Set the min-
utes
/ 1/3 1/3
3
1) Boiler
2) Aer r12 minutes,
heater
HEAT+SAN DHW 0/1 0/1/2 /
Set the min-
utes
5/6 2/3
4
1)
2) Aer r12 minutes, boiler
HEAT+SAN DHW 0/1 0/1/2 /
Set the min-
utes
2/3 2/3
5
1) Boiler
2) Aer r12 minutes, Plant/DHW inte-
HEAT /
HEAT+SAN
HEAT/DHW 0/1 0/1/2
Set the min-
utes
Set the min-
utes
6 3
6
1)
2) Aer r12 minutes, boiler
HEAT /
HEAT+SAN
HEAT/DHW 0/1 0/1/2
Set the min-
utes
Set the min-
utes
3 3
7 1) Boiler
HEAT /
HEAT+SAN
HEAT 0/1 0/1/2
Set the min-
utes
/ 1/3/4/6 0/2
8 1)
HEAT /
HEAT+SAN
HEAT 0/1 0/1/2
Set the min-
utes
/ 0/2/5 1/3
9 1) Boiler HEAT+SAN DHW 0/1 0/1/2 /
Set the min-
utes
2/3/5/6 0/1
10 1) HEAT+SAN DHW 0/1 0/1/2 /
Set the min-
utes
0/1/4 2/3
11 1) Boiler
HEAT /
HEAT+SAN
HEAT/DHW 0/1 0/1/2
Set the min-
utes
Set the min-
utes
3/6 0
12 1)
HEAT /
HEAT+SAN
HEAT/DHW 0/1 0/1/2
Set the min-
utes
Set the min-
utes
0 3
INTEGRATIONS INTERVENTION ORDER
-
pressor or with setpoint not reached
STATUS OPERATION r10 r15 r12 r16 r23 r24
1 1) DHW integraon heater COOL+SAN DHW 0/1 1 /
Set the
minutes
0/1/2/3/4/5/6 2/3
TABLE 6. INTEGRATION HEATERS OPERATION
STATUS OPERATION PLANT INTEGRATION HEATER DHW INTEGRATION HEATER
1 HEAT+SAN HEAT Works as indicated in TABLE 1,2,3 and 4.
In “HEAT+SAN”, by default sanitary temperature con-
trol has priority over that of the plant, therefore if re-
quired by the temperature control, the unit goes to
“SANITARY” mode and the DHW integraon heater acts
as indicated in TABLES 1,2,3 and 4.