11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
36
1. Liftgate and additional
Battery Box are typically
installed on trailers as
shown in FIG. 36-1 and
on trucks as shown in
FIG. 36-2. See the follow-
ing page for battery and
cable connections.
LIFTGATE
ADDITIONAL BATTERY BOX -
TYPICAL LOCATION
PUMP BOX
(LIFTGATE POWER UNIT)
RECOMMENDED LIFTGATE & BATTERY BOX
INSTALLATION ON TRAILER
FIG. 36-1
TRAILER-MOUNTED
CIRCUIT BREAKER -
SECONDARY LOCATION
CIRCUIT
BREAKER
POWER CABLE
(200 AMP IN-LINE
FUSE SHOWN)
CHARGE LINE
RECOMMENDED LIFTGATE POWER CONFIGURATION
OPTIONS
TRACTOR BATTERY
CIRCUIT BREAKER -
PRIMARY LOCATION
LIFTGATE
ADDITIONAL BATTERY BOX -
TYPICAL LOCATION
PUMP BOX
(LIFTGATE POWER UNIT)
RECOMMENDED LIFTGATE & BATTERY BOX
INSTALLATION ON TRAILER
FIG. 36-2
CIRCUIT
BREAKER
POWER CABLE
(200 AMP IN-LINE
FUSE SHOWN)
CHARGE LINE
TRUCK BATTERY
CIRCUIT BREAKER -
PRIMARY LOCATION
TRACTOR BATTERIES -
TYPICAL LOCATION
TRUCK BATTERIES -
TYPICAL LOCATION