EasyManuals Logo

Maxxus MX-M206-01 User Manual

Maxxus MX-M206-01
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
9
12. Place the Front Panel up and onto the Floor Panel and align it with both the Left and Right Side Panels. Next, latch
the Front Panel with the Left and Right Side Panels respectively. Note: Be cautious with the glass door to avoid
breakage. See FIG-12
FIG-12 Assembling Front Panel
13. Latch the Left Side Panel and Right Side Panel with the Front Panel. The buckle has a guide tab that must be placed
in the guide slot for alignment. When the Front Panel and the Side Panels are attached together on the Floor Panel,
make sure all the buckles are latched. See FIG-7 and FIG-12
14. Place cords/wires of Front Panel, Back Panel, and Side Panels into the sauna room area to avoid damaging the
cords/wires during the roof installation. Open the door, lift the Roof Panel up and over the sauna room and gently
lower it into place resting it on the wall panels. Make sure that all cords/wires are slipped through the
corresponding holes in the Roof Panel. Screwing the Roof Panel down is optional. See FIG-13 and FIG-14
FIG-14 Connecting cord connectors
FIG-13 Slip cords/wires through corresponding holes

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Maxxus MX-M206-01 and is the answer not in the manual?

Maxxus MX-M206-01 Specifications

General IconGeneral
BrandMaxxus
ModelMX-M206-01
CategoryPlumbing Product
LanguageEnglish

Related product manuals