EasyManua.ls Logo

Mazda LF - Page 28

Mazda LF
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE
B11
B
.
Connecting Rod Cap Disassembly Note
1. Inspect the connecting rod side clearance. (See B22 CONNECTING ROD INSPECTION .)
2. Remove the connecting rod bolt from the connecting rod cap by tapping the bolt with a plastic hammer.
Note
The tappets are numbered to make sure they are assembled in their original positions. When removed,
keep the tappets with the cylinder head they were removed from. Do not mix the tappets.
Main Bearing Cap Disassembly Note
1. Inspect the crankshaft end play. (See B20 CRANKSHAFT INSPECTION .)
2. Loosen the main bearing cap bolts in two or three
steps in the order shown.
End Of Sie
1 Balancer unit (L3, L3 (with variable valve timing
mechanism))
2 Connecting rod cap
(See B11 Connecting Rod Cap Disassembly Note)
3 Lower connecting rod bearing
4 Upper connecting rod bearing
5 Connecting rod, Piston assembly
6 Piston ring
7 Main bearing cap
(See B11 Main Bearing Cap Disassembly Note)
8 Lower main bearing, thrust bearing
9 Crankshaft
10 Upper main bearing, thrust bearing
11 Oil jet valve
12 Cylinder block
13 Adjustment shim
AME2224E341
1731‑1E‑02C.book11ペー2

Related product manuals