EasyManua.ls Logo

MechMaxx SG24 - Operation

MechMaxx SG24
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
www. mechmaxx.com
PRE-START CHECKLIST
OPERATION
OPERATION
Check the three lynch pins on the hitch to verify
they are securely fastened.
Verify the pins on each end of the drive shaft are
secured.
Verify the safety chains on the drive shaft are
securely attached to the cover.
Grease pivot pins
Check these items:
Frequency
Each operation.
Each operation.
Each operation.
Each operation.
Every 4 hours.
Verify the cutting tips on the cutting wheel are tight.