7.6 Decommissioning
For decommissioning, please refer to the documents listed under item 1 “General
Information”andthesystemoperator'sworkinstruction.
Procedure
• Slowly close the outlet shut-off valve (item 5.13) or
• Slowly lower the outlet pressure via the setpoint setting screw until the reserve
rail takes over the gas supply or
• Slowly raise the setpoint of the reserve rail until the operating rail is disabled.
• Close the ball valve upstream of the valves and fittings (item 5.01).
• Depressurize the system (item 5.11).
• Close the venting ball valve (item 5.11).