11
1.5 Scope of Delivery
1. Control unit HSW 3-2
2. Cable set: VL 70
consists of:
2.1. NSP ā lead (5 m) VSK 5
2.2. Mains cable (2.5 m) NKG S
2.3. Earth connection lead 5 m with clamp EK 1
2.4. Earth connection lead for transformator EK 1
2.5. Connection lead for system earth WK 1
3. Discharge rod depending on
system type
4. HV transformer with accessories depending on
system type
5. Manual
The HV test lead is not contained in the scope of delivery and has
to be ordered, if required (see below)!
Optional Accessories:
Emergency off switch NAG 1 810399
(with 5 m connection lead) NAG 1
Shielded HV test lead for DC tests:
5 m length 810003736
10 m length 820023906
Unshielded HV test lead for AC tests:
3 m length 2005029
5 m length 2004993
10 m length 2005030