54
CA115
Battery Winter Storage
Follow battery manufacturer’s instructions for storage.
CC165
Power Package Recommissioning
!
WARNING
To prevent possible injury or damage to equipment, do not install battery until all maintenance has been
performed on engine.
• Check that all cooling system hoses are connected properly and hose clamps are tight.
!
CAUTION
When installing battery, be sure to connect POSITIVE (+) battery cable to POSITIVE (+) battery terminal
FIRST, and NEGATIVE (–) battery cable to NEGATIVE (–) battery terminal LAST. If battery cables are re-
versed, or connection order is reversed, electrical system damage will result.
• Install fully charged battery. Clean battery cable clamps and terminals and reconnect cables (see CAUTION
listed above). Secure each cable clamp when connecting.
• Coat terminal connections with a battery terminal anti-corrosion agent.
• Perform all checks in OPERATION CHART in the BEFORE STARTING column.
!
CAUTION
Refer to precautions listed under “FLUSHING COOLING SYSTEM” before starting engine.
• Start engine and closely observe instrumentation to make sure that all systems are functioning correctly.
• Carefully inspect engine for fuel, oil, fluid, water and exhaust leaks.
• Check steering system, shift and throttle control for proper operation.
• Check fuel system sight tube for evidence of fuel. If fuel is present, contact your Authorized MerCruiser Dealer
for repairs.