OPTION 1- FITTING HORIZONTAL TOP RAIL
5
Step 7.
Re-position panel into wall profile and onto the ferrule on the tray,
drill through profiles at similar position to wall fixing screws and fix to
wall profiles with screws V4110,clips V2114 & snap-on caps V2115.
Step 8a.
Screw the horizontal support bar holder V8119 onto the
support bar ferrule V6S6SW05.
Step 9a.
Cut the support bar
Insert the horizontal support bar V1121 into the holder V8119
and position the assembled wall ferrule V8121-V8122 at the
other end. Level the bar and mark the position, remove the
bar and ferrule assembly.
V1121 to size . DO NOT CUT TOO SHORT
Step 10a.
Align and secure the wall mount
horizontal support bar wall ferrule V8121 using
plugs sad screws V4115.
V8122 for the
Step 11a.
Screw the ferrule
the wall mount. Insert the
support bar V1121 right into the
holder V8119 then slide it back
into the wall ferrule.
V8121 onto
Step 12a.
Check panel column is plumb vertical.
Tighten the grub screws at both ends of the support bar to
secure.
TIGHTEN
TIGHTEN
∅7mm
masonry bit
V8125
V6115
V2114
V4110
V2115
L
EVEL
MARK
INS
ER
T
7
8a 9a
10a
11a
12a
V8119
V8122
V4115
V8122
V8121
V6M5X5