■■■■■■■■■■■■■■■■■■■■■■
3 Installation
800 Dosino
■■■■■■■■
11
All four dosing unit ports can be used with the free-standing support
assembly.
3.2.5 Dosino with Sample Processor
With a Sample Processor, the 800 Dosino can be mounted on the side
wall of the tower.
Screwing on the holder for the dosing unit with Dosino
Figure 8 Screwing on the holder for the dosing unit with Dosino
Screw on the holder as follows:
1
Remove the second and third screws from below on the side wall.
2
Screw the 6.2057.040 holder tight with the two screws supplied.