EasyManua.ls Logo

Miovision SmartView 360 - Required Tools; Installation Requirements

Miovision SmartView 360
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Required tools (not included)
Bucket Truck: Schedule a bucket truck with a minimum reaching height of 9.14 m
(30 ft).
Stainless steel banding - 12.7 or 19 mm (½ in or ¾ in) band width recommended
Banding tool
RJ45 crimping tool
Ethernet cable test unit
For traffic-pole installation:
Stainless steel banding - 12.7 or 19 mm (½ in or ¾ in) band width
recommended
Banding tool
For mast-arm installation:
14.29 mm (9/16 in) Wrench: To loosen and tighten the nuts on the mount
Installation requirements
If you prefer to review this information in a video tutorial, see SmartView360 installation.
Requirement
Specification
Camera Mounting
Height
Recommended height: 9.14 m (30 ft) or higher.
Note: if you are mounting on a mast arm, the mounting
height might vary; however, you should make sure that there
are no obstructions and that all movements of interest are in
the camera’s field of view.
If existing poles are not tall enough, install a pole extender.
If your installation requires an Ethernet cable longer than the
30.5 m (100 ft) cable provided, use cable with a temperature
range of -34°C to 74°C (-29°F to 165°F).
The PoE port on SmartSense supports an Ethernet cable
length up to 91.4 m (300 ft). If a longer cable run is needed,
a PoE injector will be required.
6.11.19
3