1.11. Isolate the electrical and water supply before removing the cover.
1.12.1.12.
1.12.1.12.
1.12. Mains connections are exposed when the cover is removed.
1.13.1.13.
1.13.1.13.
1.13. Refer to the wiring diagram before making any electrical connections.
1.14.1.14.
1.14.1.14.
1.14. Ensure all electrical connections are tight, to prevent overheating.
2. Caution!2. Caution!
2. Caution!2. Caution!
2. Caution!
2.1.2.1.
2.1.2.1.
2.1.
Read all of these instructions and retain this guide for later use.Read all of these instructions and retain this guide for later use.
Read all of these instructions and retain this guide for later use.Read all of these instructions and retain this guide for later use.
Read all of these instructions and retain this guide for later use.
2.2.2.2.
2.2.2.2.
2.2. Pass on this guide in the event of change of ownership of the installation
site.
2.3.2.3.
2.3.2.3.
2.3. Follow all warnings, cautions and instructions contained in this guide, and
on or inside the Mira Advance.
2.4.2.4.
2.4.2.4.
2.4. The electrical installation must comply with the “Requirements for Electrical
Installations” commonly referred to as the IEE Wiring Regulations, or any
particular regulations and practices, specified by the local electricity supply
company in force at the time of installation. The installation should be
carried out by an electrician or contractor who is registered, or is a member
of, an association such as:
2.5.2.5.
2.5.2.5.
2.5. This is a high power unit; it is essential to contact your electricity supply
company to ensure that the electricity supply is adequate for the purpose.
2.6.2.6.
2.6.2.6.
2.6. The plumbing installation must comply with the requirements of UK Water
Regulations/Bylaws (Scotland), Building Regulations or any particular
regulations and practices, specified by the local water company or water
undertakers. The installation should be carried out by a plumber or
contractor who is registered, or is a member of, an association such as:
2.4.1.2.4.1.
2.4.1.2.4.1.
2.4.1. National Inspection Council for Electrical Installation and Contracting
(NICEIC), throughout the UK, Tel: 0171 582 7746.
2.4.2.2.4.2.
2.4.2.2.4.2.
2.4.2. The Electrical Contractors Association (ECA), England and Wales,
Tel: 0171 229 1266.
2.4.3.2.4.3.
2.4.3.2.4.3.
2.4.3. The Electrical Contractors Association of Scotland (ECAS),
Tel: 0131 445 5577.
2.6.1.2.6.1.
2.6.1.2.6.1.
2.6.1. Institute of Plumbing (IOP), throughout the UK, Tel: 01708 472791.
2.6.2.2.6.2.
2.6.2.2.6.2.
2.6.2. National Association of Plumbing, Heating and Mechanical Services
Contractors (NAPH & MSC), England and Wales, Tel: 01203 470626.
2.6.3.2.6.3.
2.6.3.2.6.3.
2.6.3. Scottish and Northern Ireland Plumbing Employers’ Federation (SNIPEF),
Scotland and Northern Ireland, Tel: 0131 225 2255.

Other manuals for Mira Advance

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mira Advance and is the answer not in the manual?

Mira Advance Specifications

General IconGeneral
Temperature ControlThermostatic
Warranty2 Years
Power Ratings9.8 kW
Water Connection15 mm
Outlet Connection1/2"
Water Pressure0.7 - 10 bar
Cable Entry PointsBottom entry
Safety FeaturesOverheat protection
ApprovalsWRAS