PHOTOSOPERATION PROCEDURE
8. REMOVING THE HEAT EXCHANGER AND LEV
(1)
Remove the panel and the corner box. (Refer to procedure 1)
(2) Remove the electrical box (Refer to
procedure
3) and the
nozzle assembly (Refer to
procedure
4).
(3) Remove the water cut.
(4) Remove the pipe thermistors (Refer to 7.).
(5) Disconnect the connector (CN60) on the indoor controller
board and the connector for ground wire.
(6) Remove 3 screws fixing the left side of the heat exchanger.
(See Photo 9)
(7) Remove the heat exchanger with LEV.
9. REMOVING THE ROOM TEMPERATURE THERMISTOR
(1) Remove the panel and corner box. (Refer to
procedure
1)
(2) Remove the electrical box covers. (Refer to
procedure
2)
(3) Remove the room temperature thermistor.
(4) Disconnect the connector (CN20) on the indoor controller
board.
Photo 11
Photo 12
Indoor controller board
Room temp. thermistor
(TH21)
Photo 13
Heat exchanger
Water cut
LEV
Connect for ground
Heat exchanger
LEV
Copyright 2008 MITSUBISHI ELECTRIC CORPORATION
Distributed in Dec. 2012 No. OCH447 REVISED EDITION-B
Distributed in May 2011 No. OCH447 REVISED EDITION-A
Distributed in Nov. 2008 No. OCH447 PDF 6
Made in Japan
New publication, effective Dec. 2012
Specifications are subject to change without notice.
HEAD OFFICE : TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU TOKYO 100-8310, JAPAN