15
7 OUTLINES AND DIMENSIONS
Unit : mm
Air Intake
Rear Air Intake
Handle for moving
Handle for moving
322
950
473
943
23
*1 447
*1 431
A
2
1
Handle for moving
Handle for moving
Service panel
Earth terminal
Left···Power supply wiring
Right···Indoor/Outdoor wiring
Terminal Connections
Rear piping cover
Front piping cover
Side Air Intake
Handle for moving
40
54
28 370 19
417
53
57 41
600 175175
330
Rear Air Intake
Air Discharge
Side Air Intake
Installation Feet
2-U Shaped notched holes
(Foundation Bolt M10)
2-12 o 36 oval holes
(Foundation Bolt M10)
30
220 145 145 14530
81 219
71
71
Bottom piping hole
(Knockout)
Drain hole
(5-[33)
Piping Knockout Hole Details
19 55
23 27 92
92
4075
73 63
Right piping hole
(Knockout)
Right trunking hole
(Knockout)
Power supply wiring hole
(2-[27Knockout)
[92
27 55
7323 63
40
92
65
45
Front piping hole
(Knockout)
Front trunking hole
(Knockout)
Power supply wiring hole
(2-[27Knockout)
[92
4045
65
92
27 55
23 73 63
Rear piping hole
(Knockout)
Rear trunking hole
(Knockout)
Power supply wiring hole
(2-[27Knockout)
[92
Example of Notes
1 Refrigerant GAS pipe connection (FLARE)[15.88(5/8 inch)
2 Refrigerant LIQUID pipe connection (FLARE)[9.52(3/8 inch)
*1...Indication of STOP VALVE connection location.
Over
Over
Less than
Piping and wiring connections
can be made from 4 directions:
front, right, rear and below.
4 PIPING-WIRING DIRECTIONS
3 FOUNDATION BOLTS2 SERVICE SPACE
1 FREE SPACE (Around the unit)
The diagram below shows a
basic example.
Explanation of particular details is
given in the installation manuals etc.
Over10
500
500
Over100
Dimensions of space needed
for service access are
shown in the below diagram.
Service space
30
Please secure the unit firmly
with 4 foundation (M10) bolts.
(Bolts and washers must be
purchased locally.)
<Foundation bolt height>
FOUNDATION
over 100mm
over 500mm
over 10mm
FREE
over 10mm
VHA/R3
VHAR4
673
A
670
PUHZ-SW75VHA.UK PUHZ-SW75VHAR3.UK PUHZ-SW75VHAR4.UK
PUHZ-SW75VHA-BS.UK PUHZ-SW75VHAR3-BS.UK PUHZ-SW75VHAR4-BS.UK