EasyManua.ls Logo

Mitsubishi PUHZ-SW75VHAPUHZ-SW100VHAPUHZ-SW100YHAPUHZ-SW120VHAPUHZ-SW120YHAPUHZ-SW75VHA-BSPUHZ-SW100VHA-BSPUHZ-SW100YHA-BSPUHZ-SW12 - Page 53

Mitsubishi PUHZ-SW75VHAPUHZ-SW100VHAPUHZ-SW100YHAPUHZ-SW120VHAPUHZ-SW120YHAPUHZ-SW75VHA-BSPUHZ-SW100VHA-BSPUHZ-SW100YHA-BSPUHZ-SW12
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
LO1, LO2, LO3
POWER SUPPLY
LO1-LO2/LO2-LO3/LO3-LO1: 400 V AC OUTPUT
(Connect to the outdoor power circuit board (TB1-L1, L2, L3))
Outdoor power circuit board
PUHZ-SW75VHA.UK
PUHZ-SW75VHAR3.UK
PUHZ-SW75VHA-BS.UK
PUHZ-SW75VHAR3-BS.UK
Brief Check of DIP-IPM and DIP-PFC
Usually, they are in a state of being short-circuited if they are broken.
Measure the resistance in the following points (connectors, etc.).
If they are short-circuited, it means that they are broken.
1. Check of DIP-IPM
P2 - U , P2 - V , P2 - W , N2 - U , N2 - V , N2 - W
2. Check of DIP-PFC
P1 - L , P1 - N , L - N1 , N - N1
Note:The marks L , N , N1 , N2 , P1 , P2 , U , V and W shown
in the diagram are not actually printed on the board.
CN2
Connect to the outdoor controller circuit board (CN2)
15:Outdoor power circuit board
Transmitting signal
to the outdoor controller circuit board (0–5 V DC)
25: Zero cross signal (0–5 V DC)
34: Not used
65: 16V DC
75: 16 V DC
1, 2, 6, 7 : +
5 : –
]
[
LD1-LD2
280–380 V DC
Connect to
the outdoor
controller
circuit board
(CNDC)
R, S
Connect to the ACL
230 V AC
U, V, W
Connect to the compressor (MC)
Voltage among phases: 5 to 180 V AC
LD9
Connect to
the earth
CN5
Primary current detection
(Connect to the outdoor
noise filter circuit board
(CN5))
CN4
Connect from the
outdoor controller
circuit board
(CN4)
CN3
Thermistor
<Heat sink>
(TH8)
DIP-IPM
DIP-PFC
P1 N L N1 N1
N2 W V U P2
OCH533D

Related product manuals