EasyManua.ls Logo

Mitsubishi QD75M1

Mitsubishi QD75M1
882 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 - 100
MELSEC-Q
9 MAJOR POSITIONING CONTROL
Operation timing and processing time during position-speed switching
control
Positioning start signal
[Y10,Y11,Y12,Y13]
BUSY signal [XC,XD,XE,XF]
M code ON signal
[X4,X5,X6,X7](WITH mode)
Standing by In position control Standing byAxis operation status
M code OFF request
Start complete signal [X10,X11,X12,X13]
Positioning operation
M code ON signal [X4,X5,X6,X7]
(AFTER mode)
M code OFF request
t1
t2
t3
t2
Positioning complete signal
[X14,X15,X16,X17]
In speed control
Position
control
Speed
control
External position-speed switching
command
t6
Speed control command speed is from the input position of
the external position-speed switching signal.
Md.26
Position-speed switching
control speed change register
Cd.25
Cd. 7
Cd. 7
Status: b4
OPR complete flag
Md.31
Stop signal
[STOP]
t4
Position control carried out until position-speed switching
signal turns ON.
Fig. 9.19 Operation timing and processing time during position-speed switching control
Normal timing time Unit: ms
t1 t2 t3 t4 t5 t6
1.0 to 1.4 0 to 3.5 0 to 3.5 5.5 to 7.9 - 1.0
The t1 timing time could be delayed by the operation state of other axes.

Table of Contents

Related product manuals