29MCP15-500.9
START-UP PROCEDURE - CONTINUED
Stacked Primary/Secondary Furnaces jStacked Secondary Furnaces (Opposite Side of Cabinet) j
Figure 29.1 - Gas Heat Option Gas Controls - D-Cabinet Sized Units - 900,000 Btu/hr and Larger (81% Eff)
Secondary Furnace “B” k
Primary Furnace k
Secondary Furnace “A” k
Secondary Furnace “C” k
j Refer to Figure 25.3 for location of furnace positions.
k Refer to Figure 28.1 for idenfication of furnace
components.
j Refer to Figure 25.3 for location of furnace positions.
k Refer to Figure 28.1 for idenfication of furnace
components.