Loading...
17
12
Setting voltage point back
to utility source when
selecting “SBU priority” or
“Solar first” in program 01.
Available options in 24V models:
22.0V
22.5V
23.0V (default)
23.5V
24.0V
24.5V
25.0V
25.5V
Available options in 48V models:
44V
45V
46V (default)
47V
48V
49V
50V
51V
13
Setting voltage point back
to battery mode when
selecting “SBU priority” or
“Solar first” in program 01.
Available options in 24V models:
Battery fully charged
24V
24.5V
25V
25.5V
26V