Then screw on the outer ring to secure the cable in
place and prevent water ingress.
Once the base station has been fully wired, it can be
secured in place with the four screws provided. Use
the allen key provided to screw them in securely
ensuring they are fully inserted and flush with the
station base. Protruding screws can hinder the
mower from locating correctly.
Push the cover back to its original position to cover
the wires and connections from water ingress.
Making sure the power is switched off at the socket,
screw the two charging rods into the holes just
below the cover of the base station. Note: This is
where the LED status indicator is situated. See page
83.