EasyManua.ls Logo

MTS Systems 318 Series - Page 50

MTS Systems 318 Series
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
318 Load Unit
50
Installation
The load unit is extremely heavy.
The weight of the load unit can seriously hurt you and damage your load
unit.
Do not allow the load unit to drop or topple. Observe the following precautions:
Ensure that your chains, slings, and crane have a working capacity greater
than the load unit’s weight.
Ensure that the lifting eyebolts are tight.
Ensure that the crosshead locking bolts are fully tightened.
Lift the load unit only high enough to clear its pallet.
Operate the crane smoothly to prevent sudden shocks to the sling.
Unpacking the Load Unit
1. Cut the packing straps and remove any bolts as needed. Make sure the
lifting eyebolts are tight.
WARNING

Table of Contents

Related product manuals