EasyManua.ls Logo

MTU 8 V 2000 M9x - Operation Procedures; Engine Recommissioning After Extended Out-of-Service Periods

MTU 8 V 2000 M9x
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Operation
4.1 Putting the engine into operation after extended out-of-service
periods (>3 months)
Preconditions
☑Engine is stopped and starting disabled.
☑MTU Preservation and Represervation Instructions (A001070/..) available.
Putting the engine into operation (out-of-service period > 3 months)
Item Action
Engine Depreserve (→ MTU Preservation and Represervation Instructions
A001070/..).
Lube oil system Check engine oil level (→ Page 104).
Fuel prefilter Fill with fuel (→ Page 97).
Fuel prefilter, pressure gage Align adjustable pointer with position of pressure indicator (→ Page 92).
Fuel system Vent (→ Page 89).
Raw water pump (if located
above waterline)
Prime (approx. 3 to 4 liters).
Filling point (→ Page 111).
Coolant circuit If engine is out of service for more than one year, change engine coolant
(→ Page 117).
Coolant circuit Check coolant level (→ Page 116).
Coolant circuit Heat engine coolant with coolant preheating unit.
Engine Control Unit ECU Check plug connections (→ Page 135).
Engine Interface Module EIM Check plug connections (→ Page 137).
Engine Monitoring Unit EMU Check plug connections (→ Page 136).
48 | Operation | M015590/06E 2014-03
TIM-ID: 0000002213 - 004

Table of Contents