Installation and commissioning 6
1 Installation and commissioning
1.1 Customers on-site connection requirements
Necessary preparatory work for electricity, water and drainage connections at the customer‘s premises are to be arranged by the machine owner/operator.
The work must be carried out by authorised installation technicians in compliance with general, country-specific and local regulations.
The WMF Service engineers may only connect the coffee machine to existing prepared connection points.
WMF Service is neither authorised nor responsible for carrying out any work on-site prior to connection.
For details, see the planning information on the website www.wmf-coffeemachines.com.
Notes
- Electrically conductive counter surfaces must be earthed
- Unplug the mains plug before disconnecting the mains voltage across the cold appliance plug
1.2 Hardware connection and preparatory work
1.2.1 General tasks
Place the coffee machine horizontally on the counter (width and depth); adjust feet where adjustable
Connect the water infeed
Water filter needed? If “Yes” – connect (for details, see the following chapter)
Connect the drain use angle 33 2165 8000 from horizontal to vertical!