10 E-Coder)R900i Installation and Maintenance Guide
5 Installing the Inside Version
This section describes storage and unpacking instructions, preliminary tests, tools, materi-
als, site selection, and inside installation of theE-Coder)R900i version MIU.
Prior to Installation
Storage
Upon receipt, inspect shipping containers for damage, and inspect the contents of any
damaged cartons prior to storage.
Once the inspection is complete, store the cartons in a clean, dry environment. The unit
should be in sleep mode until it is exposed to light.
Unpacking
As with all precision electronic instruments, the E-Coder)R900i MIU should be handled
carefully; however, no additional special handling is required. When shipped, the assem-
bly is lying on its side. You should lift the assembly out of the box by the meter main case.
Refrain from lifting it using the battery assembly.
After unpacking the MIU, inspect it for damage. If the MIU appears to be damaged or
proves to be defective upon installation, notify your Neptune Territory Manager or Dis-
tributor. If one or more items requires reshipment, use the original cardboard box and
packing material.
Figure 6 E-Coder)R900i Inside Installation