EasyManua.ls Logo

Neptune Technology E-Coder)R900i - Testing the E-Coder)R900 i Pit Installation; Completing the E-Coder)R900 i Pit Installation

Neptune Technology E-Coder)R900i
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the Pit Version
18 E-Coder)R900i Installation and Maintenance Guide
Testing the E-Coder)R900i Pit Installation
After the MIU has been installed, follow these steps to verify that the
MIU is working properly.
1 Power up the handheld unit (HHU) test device to start the testing
program provided.
2 When the E-Coder)R900i is installed correctly, its MIU ID# and a
meter-reading appears on the HHU’s display within one minute.
Verify that this is the correct meter reading by comparing it to the
meters dial.
3 If a meter reading does not appear on the HHU’s display or the
meter reading in the HHU’s display is not the same as the reading
on the meters dial:
Reactivate the MIU by using a flashlight to activate the photo
sensor light.
Verify the battery is connected.
Test the installation again (repeat steps 1 and 2).
Completing the E-Coder)R900i Pit Installation
1 Read the MIU one more time before leaving the site to ensure MIU
is transmitting.
2 Make sure the appropriate ID# on the MIU has been assigned to the
meter setting.
3 Before leaving the installation site, refer to the “Checklist” on
page 14
To avoid RF signal saturation of the HHU, position the receiver at least 2 to 3
feet from the MIU. In a densely saturated area, removing the antenna from
the handheld can assist with readings.
A register reading of 8 digits will be returned.
The light sensor is located under a small recess near the center of the
dial plate. This recess is denoted by a flashlight symbol on the dial
plate.
All tags are provided to aid in the elimination of transcription errors.

Table of Contents