E-Coder)R900i Installation and Maintenance Guide 15
6 Installing the Pit Version
This section describes storage and unpacking instructions, preliminary tests, tools, materi-
als, site selection, and pit installation of theE-Coder)R900i version MIU.
Prior to Installation
Storage
Upon receipt, inspect shipping containers for damage and inspect the contents of any dam-
aged cartons prior to storage.
The unit should be in sleep mode until it is exposed to light. The unit should not be trans-
mitting until the box is opened and the unit is exposed to a light source.
Unpacking
As with all precision electronic instruments, the E-Coder)R900i MIU should be handled
carefully; however, no additional special handling is required.
After unpacking the MIU, inspect it for damage. If the MIU appears to be damaged or
proves to be defective upon installation, notify your Neptune Territory Manager or Dis-
tributor. If one or more items requires reshipment, use the original cardboard box and
packing material.
Figure 7 E-Coder)R900i Pit Installation