EasyManua.ls Logo

NETZSCH NM038BY - c) Top Lubrication for Vertically Installed Pumps

Default Icon
109 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 MAINTENANCE
PAGE
7.4
c) Top lubrication
Attention: For vertically installed pumps with overhead drive as type BT/NT:
On initial start-up the mechanical seal has not come
in contact with the medium. It runs therefore dry for
a short period of time until the air is displaced from
the pump housing.
I On first start-up and if stood idle for longer periods
lubricate the mechanical seal before switching on the
pump.
I Apply water, glycerine or oil depending on their
compatibility with the pumping medium and the
elastomer of the mechanical seal.
I Fill the gap between the connecting shaft (1) and the
mechanical seal (2) or mechanical seal housing (3).
Pump model with “mechanical seals” (sectional drawing W251.000):
The lubricating should be done:
- when putting into operation
- after every 350 hours of operation
- before and after operation interruptions of 6 - 8 weeks
issued: 09.01.2013 Revision: 6
text no.
07400-2/2
copy to:
1
2
3
IPP - EN - EN_07400_20130109/3 - D8411276 - 4300003998 - 000100 - NPS - 00229929 N 2018-02-21 19:03:25
39

Related product manuals