1. Arches (2) - 10747-1
2. Arch Rafters (5) - 10756
3. Post Caps (4) - 10748-1
4. Left Posts (2) - 10749-1
5. Right Posts (2) - 10750-1
6. Side Panel Top Horizontal Rails (2) - 10751-1
7. Side Panel Bent Vertical Spindles (4)
Length 56.5 in. (144 cm) - 10752-1
8. Side Panel Middle Straight Vertical Spindles (2)
Length 55.4 in. (141 cm) -10753-1
9. Side Panel Middle Horizontal Rail (2) - 10754-1
10. Side Panel Bottom Horizontal Rail (2) 10755-1
11. Ground Mounting Extensions (4) - 10845
12. 1 1/4 in (32 mm) Self Auguring Screws (34) - 20047
13. 5/8 in (16 mm) Self Auguring Screws (8) - 20016
Tools You Will Need
• Cordless Drill
• Level
• Stool or Short Ladder
• Shovel
• Cement (For Installation)
Assembly Time
• Approximately 30 minutes (2 People)
General Information
Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area approx 10 ft. x
8 ft. (3 m x 2.4 m) for unobstructed assembling.
• You should not need to use excessive force when assembling components.
Please read through before starting assembly.
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346 (Mon. to Fri. 8:00 AM to 4:00 PM EST).
(UK Tel:
(44) 2038 687160 (Mon. to Fri. 1:00 PM to 10:00 PM GMT).
ASSEMBLY INSTRUCTIONS
The London Arbor / Arch
1
Not to Scale
7
6
5
4
2
3
1
42 in
(107 cm)
45 in
(114 cm)
18 in
(46 cm)
21 in
(53 cm)
83.5 in
(112 cm)
78.5 in
(199 cm)
8 in (20 cm)
56 in
(142 cm)
8
9
10
11
12
V3.2/072717
13
www.newenglandarbors.com
www.newenglandarbors.co.uk