LIFT FROM THE STREET TO THE SET UP
LOCATION
If the base allows, the simplest thing is to use a pallet
truck to move the S2125 to the set up location.
NOTE
The centre of gravity is offset to one side (see
print on the packaging).
LEK
C:a 180 kg
If S2125 needs to be transported across soft ground,
such as a lawn, we recommend using a crane truck that
can lift it to the installation location. When S2125 is lifted
with a crane, the packaging must be untouched.
If a crane vehicle cannot be used the S2125 can be
transported on an extended sack truck. S2125 must be
taken from its heaviest side and two people are required
to lift S2125.
LIFT FROM THE PALLET TO FINAL
POSITIONING
Before lifting remove the packaging and the securing
strap to the pallet.
Place lifting straps around each machine foot. Lifting
from the pallet to the base requires four persons, one
for each lifting strap.
SCRAPPING
When scrapping, the product is removed in reverse or-
der. Lift by the bottom panel instead of a pallet!
NIBE S2125Chapter 2 | Delivery and handling10