Inspection of the installation
Current regulations require the heating installation to undergo an installation inspection before it is commissioned.
The inspection must be carried out by a suitably qualified person. In addition, fill in the page for information regarding
the installation data in the User Manual.
DateSigna-
ture
NotesDescription
Heating medium (page 23)
Automatic gas separator installed
System flushed
System vented
Particle filter
Shut-off and drain valve
Charge flow set
Electricity (page 25)
Fuses property
Safety breaker
Earth circuit-breaker
Heating cable type/effect
Fuse size, heating cable (F3)
Communication cable connected
S2125 addressed (only when cascade
connection)
Cooling permitted
Connections
Main voltage
Phase voltage
Miscellaneous
Condensation water pipe
Insulation for condensation water
pipe, thickness (unless KVR 11 is
used)
NOTE
Check the connections, main voltage and phase voltage before the machine is started, to prevent damage
to the heat pump electronics.
NIBE S2125Chapter 1 | Important information6