Transport
VVM 225 should be transported and stored vertically in
a dry place. However, the VVM 225 may be carefully
laid on its back when being moved into a building.
Assembly
• Position VVM 225 on a firm base that can take the
weight. Use the product's adjustable feet to obtain a
horizontal and stable set-up.
The space where VVM 225 is located must be frost-
free.
30 - 50 mm
30 - 50 mm
15 - 40 mm
• Because water can emerge from the safety valve, the
area where VVM 225 is located must be provided with
floor drainage.
INSTALLATION AREA
Leave a free space of 800 mm in front of the product.
All service on VVM 225 can be carried out from the front.
NOTE
Leave 10 – 25 mm free space between
VVM 225 and the wall behind for routing cables
and pipes.
NIBE VVM 225Chapter 2 | Delivery and handling8
2 Delivery and handling