EasyManua.ls Logo

nifty SP45 - Preparation and Maintenance Schedules; Unpacking and Initial Setup

nifty SP45
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SP Series
Operating & Safety Instructions
USA – 11/14
Original instructions
11
3 Preparation and Inspection
3.1 UNPACKING
Since the manufacturer has no direct control over the shipping or carriage of any Niftylift it is the
responsibility of the dealer and/or owner and/or lessee to ensure the Niftylift has not been damaged in
transit and a Pre-operational Report has been carried out by a qualified engineer before the Niftylift is
put into service.
1) Remove all ropes, straps and or chains used to secure the Niftylift during transit.
2) Ensure any ramp, loading dock or forklift used is capable of supporting or lifting the Niftylift.
3) If the Niftylift is to be driven off, please ensure that the operator has read and fully understood this
entire manual. Refer to the appropriate section for precise operating instructions.
***Carry out the Pre-operational Report before placing machine in service.
3.2 PREPARATION FOR USE
Whilst every effort has been made at the Niftylift factory to ensure your machine arrives in a safe and
operable condition it is necessary to carry out a systematic inspection prior to putting the Niftylift into
service.
THIS IS NOT A REQUEST IT IS MANDATORY
To assist the user in this task you will find enclosed a Pre-operational Report, which must be filled out
upon delivery/receipt of the machine.
Before the user carries out the Pre-operational Report he must have read and fully understood all the
contents of the Operating, Safety and Maintenance Manual.
WARNING - DO NOT OPERATE A POTENTIALLY DEFECTIVE OR
MALFUNCTIONING MACHINE. CORRECT AND REPAIR ANY DEFECTS BEFORE
OPERATING YOUR NIFTYLIFT.

Related product manuals