10
Operation Procedure
5
Post-use Maintenance
6
Follow the Operation Manual for VIVA ace Basic Set.
(
Reference
:
6 Operation Procedure
)
6-1 Preparation for Maintenance
1
Wear eye protection, a mask, and gloves to
prevent infection.
2
Turn off the Power Switch of the Control
Unit.
3
Remove the Water Plug (IN) [Clear Tube]
while pulling the Slide Ring.
4
Remove the Water Plug (OUT) [Blue Tube]
pressing the Slide Ring.
5
Dispose of the water in the Water Bottle and
place the empty bottle again in the Control
Unit.
6
Turn on the Power Switch of the Control Unit.
7
Maximize Motor Water Adjuster, activate the Motor to let out the water remaining in the Motor Cord.
Water Plug (IN)
[Clear Tube]
Slide Ring