EasyManua.ls Logo

NuWave Nutri-Pot 33501 - Operating Instructions; Step-by-Step Guide

NuWave Nutri-Pot 33501
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Operating Instructions
Silicone Gasket Installation
OPERATING INSTRUCTIONS
Open lid: Hold the lid handle. Turn the lid counter clockwise to open position
then raise it. Make sure to install the Water Collector Box.(See below)
1
2
Place ingredients and water in the inner pot. Ingredients and water
should not exceed 4/5 height of the inner pot. If the ingredients expand
easily in water, then the total amount should not exceed 3/5 height
of the inner pot. The minimum amount of ingredients and water is
normally 1/5 height of the inner pot. (See below).
3
Place the inner pot in the Housing. Clean the bottom of inner pot and
surface of heating plate before inserting the inner pot. (See below).
4
Close lid:
Check that the Silicone Gasket is secured in the lid before closing.
Hold the lid handle. Lower the lid, then turn the lid clockwise to close.
A sound will conrm that the lid has been closed properly. (See below).
4
5
3
5
1
5
The push rod on the side
of the lid needs to align
properly to the base in order
for the lid to lock into place.
Right side
Note: Install the
Water Collector
Box on the right
side just below
the handle.
At a 45˚ angle
press in.

Related product manuals