NVIDIA Spectrum-4 SN5000 2U Switch Systems Hardware User Manual 14
Installation
System Installation and Initialization
Installation and initialization of the system require attention to the mechanical, power,
and thermal precautions for rack-mounted equipment.
The installation procedure for the system involves the following phases:
Warning
The rack mounting holes conform to the EIA-310 standard for 19-inch
racks. Take precautions to guarantee proper ventilation in order to
maintain good airflow at ambient temperature.
Warning
Unless otherwise specified, NVIDIA products are designed to work in
an environmentally controlled data center with low levels of gaseous
and dust (particulate) contamination.
The operation environment should meet severity level G1 as per ISA
71.04 for gaseous contamination and ISO 14644-1 class 8 for
cleanliness level.