EasyManuals Logo

Omron E2E series User Manual

Omron E2E series
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
7
IO-Link Connection Procedure
27
9
A confirmation dialog box is
displayed. Confirm that there is
no problem, and click Yes.
A screen is displayed stating
"Synchronizing".
A confirmation dialog box is
displayed. Confirm that there is
no problem, and click No.
*Do not return to RUN mode.
10
As shown in the figure on the
right, the font color that is used
to display the text of
synchronized data changes to
the same color as the one used
to specify "Synchronized".
Check that a message is
displayed stating "Cycle the
power supply to the slave(s) to
apply the settings". Click Close.
*When the Sysmac Studio
project data coincides with the
Controller data, the
synchronized data will have the
same font color as the one
used to specify
"Synchronized".
*If the synchronization fails,
check the wiring and repeat
from step 1.
11
To reflect the settings, turn OFF
Unit power supply for Slave
Terminal, then turn it back ON.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron E2E series and is the answer not in the manual?

Omron E2E series Specifications

General IconGeneral
BrandOmron
ModelE2E series
CategoryNetwork Hardware
LanguageEnglish

Related product manuals