EasyManua.ls Logo

Omron Powli BY35S - Page 49

Omron Powli BY35S
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.Maintenance and Inspection
38
5.
Fit the front panel.
Turn the 2 screws to secure the font panel clockwise with a screwdriver.
Fit the front panel.
Tighten the 2 screws.
Battery replacement is now completed.
Write the usage start date on the label on the side. Also, by using the in-
cluded UPS monitoring software, possible to keep a record of usage start
date by the software.
<After replacing the battery when operation was stopped...>
Connect the AC input plug to a wall outlet (commercial power) and turn ON the power switch
of the UPS. When operation starts, the self-diagnostic test is automatically performed. Nor-
mal operation resumes after the 10-second test.
<After replacing the battery during operation...>
If the battery replacement indicator is displayed and the beeper sounds before replacement,
press the beeper stop/test button once to stop the beeper, and hold it for 5 sec. to perform
a self-diagnostic test. The beeper stops and normal operation resumes after the 10-second
test is complete.

Related product manuals