EasyManua.ls Logo

Omron SJDE-APA-OY - Connector for Power Supply;Regenerative Unit (CNA)

Omron SJDE-APA-OY
63 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.8 Wiring the Power Supply/Regenerative Unit Connector (CNA)
31
5. Connect the connector to the SERVOPACK.
After wiring the connector, reconnect the connector to the SERVOPACK.
Note: 1. Pull lightly on the wires to confirm that they are securely connected.
2. Be sure that none of the insulating sheaths of the wires are caught in the springs.
Connector for Power Supply/Regenerative Unit (CNA)
Pin No. Symbol Signal Name
1L1
Power supply input terminals
2L2
3+
Regenerative unit connection ter-
minals
4
Power supply/Regenerative Unit connector
JZSP-CHG9-1
(This connector is supplied with the servopa
c
Power supply
Single-phase, 200 VAC
Molded-case circuit breaker
Noise filter
Magnetic contactor
AC reactor
Regenerative Unit
CNA connector
FuseFuse
+(Y3)
Y4
Y5
C1
C2
1
2
3
4
L2 L1
TOEP_C710806_01A_0_0.book Seite 31 Montag, 2. Juli 2007 4:24 16

Table of Contents

Related product manuals