Version 1.0.3 - 2022-04-06 89Translation of original instruction
D17 Pro│D23 Pro│D26 Pro│D33 Pro EN
D17Pro_D23Pro_D26Pro_D33Pro_GB_3.fm
3.7.1 Warming up the machine
ATTENTION!
If the drilling machine and in particular the drilling spindle is immediately operated at
maximum load when it is cold it may result in damages.
If the machine is cold, e.g. directly after having transported the machine, it should be warmed
up at a spindle speed of only 500 1/min for the first 30 minutes.