15
STEP 14 - Open the two push-buon latches and fold down the kitchen door. Unhook the two
locking spring-bolts and slide your kitchen out. Quick-connect your water and gas at the kitchen
connecon points and the quick connects on the side of the OP15. Please see the secons on the
Gas System, Water system and the Kitchen for more informaon on seng up the kitchen.
STEP 15 - Route your sink drainage hose out of the boom of the kitchen and into your
designated grey water carrier.
STEP 16 - Open and latch your OP15 entry door. Turn on the power and lights. Press the circular
buon on the le of the entry way to deploy electric step.
STEP 17 - Pull out the securing pins for the front and rear liing mechanisms.
STEP 18 - Use the interior roof li bars at the front and rear of the OP15 to push the roof up into
place. Slide the securing pins for the roof liing mechanism into place to secure the roof.
STEP 19 - Fold out the main bed maress. You will nd two addional white cushions covered with the same fabric as the maress
and two addional blue leatheree covered cushions. Place the white cushions on either side of the maress and the two blue
cushions between those cushions at the outer wall to help keep your maress in place.
13b
13a
12b
12
13c
18b
18a
17
15
14b
14a
SETTING UP YOUR OP15 cont.