For AC power installations, use a regulating UPS to protect the Acme Packet
6300/6350 from power surges, voltage spikes, and power failures.
For AC power installations, ensure that your UPS can supply power for enough
time to save your system data and shut down the system gracefully.
Mounting Installation
Overview
This section explains how to unpack and install your Acme Packet 6300/6350 in a
telecommunications or server equipment rack. The Acme Packet 6300/6350 standard
mounting hardware is used for installation in a 4-post, 19-inch cabinet-style equipment
rack. Mounting hardware for a 23” equipment rack is available by special order.
Mounting Options
The Acme Packet 6300/6350 ships with hardware for mounting in 4-post tapped-hole
equipment rack or square-hole equipment rack. The Acme Packet 6300/6350 also
ships with hardware for mounting in a 2-post center-mount equipment rack. This
section explains the procedures for each mounting option.
Note:
Failure to follow the instructions outlined in this section might compromise
the Acme Packet 6300/6350 proper functioning. To prevent personal injury,
we recommend that two people lift and install the chassis into the equipment
rack.
Unpacking the Acme Packet 6300/6350
To unpack the Acme Packet 6300/6350:
1. Inspect the external packing materials and note if they are damaged in any way.
2. Open the exterior box.
3. Unpack the contents of the Acme Packet 6300/6350 shipment.
4. Locate the packing list that comes with the Acme Packet 6300/6350 shipment; the
packing list is located outside of the shipment box.
5. Confirm that all of the components listed in the shipping box contents are present
and in good condition.
If you discover that any of the parts are missing or were damaged in shipment,
contact Oracle to request assistance.
Cabinet-Style 4-Post Chassis Installation
The following sections explain how to mount your Acme Packet 6300/6350 in a
cabinet-style, 4-post equipment rack.
Chapter 4
Mounting Installation
4-4

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle Acme Packet 6300 and is the answer not in the manual?

Oracle Acme Packet 6300 Specifications

General IconGeneral
BrandOracle
ModelAcme Packet 6300
CategoryController
LanguageEnglish

Related product manuals