4
Go to Section 4 (Page 9)
ESBE BOILER VALVE, BRASS/TERMOMIX
1a 1b
А
Set the installation plate into the valve as indicated in the gure. The pegs located in the corners of the installation plate should
be aligned with the corner holes. NOTE! If necessary, turn the scale according to the operating direction. Remember to also turn
the valve shaft bevel according to the operating direction. The regulator direction of the valve opening counter-clockwise (1b)
should be changed according to Section 12 (regulator installed).
Valve opens clockwise Valve opens counterclockwise
Shaft bevel position during
installation (valve shut)
Shaft bevel position during
installation (valve open)
Supply
water
Return
water
Return water
Supply
water
Attach the regulator according to the illustrations, ensu-
ring that the gear tting alignment surfaces face the regu-
lator and the installation plate pegs are placed correctly.
Use the manual control lever to check that
the valve turns freely over the full range of
movement (90°). You must press the
manual control knob while you
are turning the manual control
lever.
3
B
C
D
E
F
А
Contents of the installation package
Shaft tting
Manual operation
lever
Gear tting
ScrewWasher
(Use only indicated parts!)
Installation
plate
Install the shaft tting on the valve shaft while observing the shaft bevel.
Install the manual operation lever on the axle of the shaft tting, pointing
horizontally to the left (9 o’clock). Place the gear tting to the shaft tting
so that the manual operation lever is between the ttings and the gear
tting pinions point up and downwards. The alignment surface of
the tting should point towards 2 o’clock. Fix the parts to the valve
shaft with the screw and washer.
А
2
B
C
D
E
F
4
D
Make sure that the valve shaft
bevel is positioned according
to the operating direction!
NOTE!
The alignment surface
should point to this
direction.
Fitting pinions