"Hydrocontrol MTR" (lead-free) Installation & Initial Operation
15
5.2 Installation of the Valve
WARNING
Thereisariskofbeing
burnedbyhot liquid
if you install the valve
in a system when it is
running. Shut down the
system section, allow
it to cool off, and drain
theliquidinacontrolled
fashion.
1. In a new installation,
itmaybenecessaryto
ushthepipelinesof
the system before
installingthevalve.
Avoidcontaminating
the valve with metal
debris,sealants,etc.
2.
Observetheowarrow on
thehousing(Fig.9).
Fig. 9:
Installation position of valve in pipeline