CONTENTS
3.1. AN OVERVIEW OF THE CRANE
3.1-1 SET-UP
3.1-2 CONTROLS
3.2. PREPARING FOR CRANE OPERATION
3.2-1 C
OLD START IN LOW OUTSIDE TEMPERATURES
3.2-2 S
UPPORTING VEHICLE PROPERLY
3.2-3 HYDRAULICALLY EXTENDABLE OUTRIGGERS
3.2-4 EXTENDING THE SUPPORT CYLINDERS
3.2-5 EXTENDING THE HYDRAULIC SUPPORT OUTRIGGERS
3.2-6 EXTENDING THE HYDRAULIC PIVOTABLE SUPPORT OUTRIGGERS
3.2-7 PUTTING CRANE INTO OPERATING POSITION
Starting up the crane Chapter 3