EasyManua.ls Logo

Palfinger PTV 35 - Page 18

Palfinger PTV 35
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PTV 33/44/55/66 Owner’s Manual
Rev. 1.0 16
Open the Liftgate Platform (continued): Be certain operating area around platform is clear before opening plat-
form. Pushing the “DOWN” button, and “OPEN” button together to power the platform open.
3. Lower the platform to the ground: Pushing the “DOWN” button, lower the platform to the ground.
Note: for power down operation, push the down button twice (within 3 seconds).
DOWN

Related product manuals