2
TABLE OF CONTENTS
PAGE PAGE
1 Safety Precautions -----------------------------------------------3
1.1. General Guidelines ----------------------------------------3
1.2. Leakage Current Cold Check ---------------------------3
1.3. Leakage Current Hot Check (See Figure 1)---------3
1.4. How to Discharge the Capacitor on Flash
PCB------------------------------------------------------------4
2Warning--------------------------------------------------------------5
2.1. Prevention of Electrostatic Discharge (ESD)
to Electrostatic Sensitive (ES) Devices---------------5
2.2. How to Recycle the Lithium Ion Battery (U.S.
Only)-----------------------------------------------------------5
2.3. Caution for AC Cord (For EB/GC/GH)----------------6
2.4. How to Replace the Lithium Battery-------------------7
3 Service Navigation------------------------------------------------9
3.1. Introduction --------------------------------------------------9
3.2. Air-leak test (inspection)----------------------------------9
3.3. Replacing the waterproof packing (waterproof
seal) -----------------------------------------------------------9
3.4. Lens Unit -----------------------------------------------------9
3.5. General Description About Lead Free Solder
(PbF) ----------------------------------------------------------9
3.6. Important Notice 1:(Other than U.S.A. and
Canadian Market) --------------------------------------- 10
3.7. How to Define the Model Suffix----------------------- 11
4 Specifications ---------------------------------------------------- 15
5 Location of Controls and Components------------------ 21
6 Service Mode-----------------------------------------------------23
6.1. Error Code Memory Function -------------------------23
6.2. ICS (Indication of additional Camera Settings
when picture was taken) function -------------------- 26
7 Troubleshooting Guide---------------------------------------- 28
7.1. Service and Check Procedures ---------------------- 28
7.2. Air-leak Test ----------------------------------------------- 31
7.3. Air-leak Test (Inspection)------------------------------- 32
8 Service Fixture & Tools ---------------------------------------34
8.1. Service Fixture and Tools ------------------------------34
8.2. When Replacing the Main PCB ---------------------- 35
8.3. Service Position ------------------------------------------35
9 Disassembly and Assembly Instructions--------------- 37
9.1. Disassembly Flow Chart--------------------------------37
9.2. PCB Location----------------------------------------------37
9.3. Disassembly Procedures------------------------------- 38
10 Measurements and Adjustments --------------------------48
10.1. Matrix Chart for Replaced Part and Necessary
Adjustment------------------------------------------------- 48
11 Maintenance ------------------------------------------------------ 49
11.1. Cleaning Lens and LCD Panel ----------------------- 49