2-15. CHECKS AFTER INSTALLATION HAVE COMPLETED
Check the following items after completing installation.
Is there a short circuit with the intake air ow?
Is the insulation secure? (Refrigerant piping)
Are there any errors with the wiring?
Are the terminal screws loose? Tightening torque (Unit: N•m { f•cm})
M4...1.57~1.96{16~20}, M5...1.96~2.45{20~25}
Is the drain water owing smoothly?
Is the insulation material properly installed?
Is the earth wire securely connected?
Is the front panel and the indoor unit air conditioner rmly xed and was the installation completed without any leakage from the refrigerant?
Are the indoor and outdoor units secured rmly installed with bolts at secured locations?
User inspection places
Serviceman inspection
places
Filter and grill cleaning
Exterior cleaning
Check the operating status
Clean the drain pan or things related to the water discharge
Heat exchanger cleaning
2-16. REGARDING DELIVERY TO THE CUSTOMER
Request the customer to review the operating instructions and explain the operating method for the product.
In addition, it is also recommended that regular inspection checks are agreed upon for maintenance.
Refer to the installation instruction manual provided with the indoor unit for the specifications on the indoor unit installation.